Slurry Treatment & Dewatering Solutions

Pipe Jacking Slurry Treatment

Pipe Jacking Slurry Treatment

Compact separation and dewatering for pipe jacking works where site space is measured in meters.

Pipe jacking slurry is heavy in fines and arrives in batches as the drive advances. The module is sized for that rhythm instead of for a peak flow.

Tell us about your slurryRecommended equipment

Typical capacity
20 – 80 m³/h
Slurry type
Bentonite / fines
Target cake
28 – 40 % dry solids

What the plant has to do

Work on these sites is measured in meters: the module stands beside the jacking shaft and shares tanks with the drive. Cake is tipped with the spoil and the filtrate returns to the slurry tank.

Recommended treatment process

Each stage is selected around the slurry and the disposal route.

  1. 01

    Receiving tank

    Slurry is buffered so the plant works at its own rate while the drive advances.

  2. 02

    Screening

    A compact screen removes coarse material in one pass.

  3. 03

    Desanding

    Cyclones take the sand fraction out before it settles in the tank.

  4. 04

    Conditioning

    Dosing follows the solids load of the batch rather than a fixed rate.

  5. 05

    Dewatering

    A chamber press produces a cake that can be tipped with the spoil.

Recommended equipment

Equipment is configured around the capacity, solids concentration and target cake moisture of your project.

Chamber Filter Press

Chamber Filter Press

Plate-and-frame dewatering for construction and industrial slurry.

Filtration area
10 – 250 m²
Filtration pressure
0.6 – 1.6 MPa
Capacity range
5 – 120 m³/h slurry feed

View product

Membrane Filter Press

Membrane Filter Press

Squeeze dewatering for higher dry solids and shorter cycles.

Filtration area
10 – 200 m²
Filtration pressure
0.6 – 1.6 MPa
Capacity range
5 – 100 m³/h slurry feed

View product

Automatic Filter Press

Automatic Filter Press

Automated filtration cycles for continuous industrial operation.

Filtration area
10 – 200 m²
Filtration pressure
0.6 – 1.6 MPa
Capacity range
5 – 100 m³/h slurry feed

View product

Operating considerations

Batching

A buffer tank between the shaft and the plant is what keeps the press cycle steady.

Road access

Skid-mounted units are chosen where the only access is over the shaft edge.

Winter operation

Dosing lines and water circuits are trace-heated where the site runs through winter.

Frequently asked questions

Tell us about your slurry

Every slurry is different. Send us your slurry characteristics and project requirements so our engineering team can evaluate a suitable dewatering solution.

Pipe Jacking Slurry Treatment

Tell us about your slurryContact DELIAN

Tell us about your slurry

Every slurry is different. Send us your slurry characteristics and project requirements so our engineering team can evaluate a suitable dewatering solution.

  • Process evaluation based on real slurry data
  • Equipment and layout proposal for your capacity
  • Cake moisture and water recovery targets

No file selectedPDF, image, spreadsheet, document or ZIP archive. Maximum 10 MB.

Tell us about your slurry WhatsApp