Chamber Filter Press
Plate-and-frame dewatering for construction and industrial slurry.
- Filtration area
- 10 – 250 m²
- Filtration pressure
- 0.6 – 1.6 MPa
- Capacity range
- 5 – 120 m³/h slurry feed
Process and wastewater sludge dewatering, with the filtration cycle matched to the sludge chemistry.
Industrial sludge is defined by its chemistry rather than its solids. The cycle, cloth and materials follow from that.

The press runs a programmed cycle in the plant hall, with the cake conveyed to a skip and the filtrate passed to the next treatment stage.
Each stage is selected around the slurry and the disposal route.
Storage is sized so the press runs on a steady cycle.
Dosing and mixing are set from the sludge chemistry.
Plate pack, cloth and pressure are chosen around the solids.
Membrane plates squeeze the cake where drier cake pays for itself.
Cake drops to a conveyor or skip; filtrate goes to the next process stage.
Equipment is configured around the capacity, solids concentration and target cake moisture of your project.
Plate-and-frame dewatering for construction and industrial slurry.
Squeeze dewatering for higher dry solids and shorter cycles.
Automated filtration cycles for continuous industrial operation.
A jar test on the real sludge sets the dose, the cloth and the cycle time.
Automatic plate shifting keeps one operator covering several presses.
Wetted parts are selected for the pH and chloride content of the sludge.
The cake formation rate of your sludge, measured in the filtration test.
The automatic configuration runs a programmed sequence with one operator per shift.
Every slurry is different. Send us your slurry characteristics and project requirements so our engineering team can evaluate a suitable dewatering solution.
Industrial Sludge Dewatering
Every slurry is different. Send us your slurry characteristics and project requirements so our engineering team can evaluate a suitable dewatering solution.